chrono DUET
Maximum flexibility and highest productivity together: a choice without compromise
The two working heads can operate simultaneously on the same piece, dividing the number of operations to be performed.
Optimization system in the distribution of the operations betweek the two heads to guarantee the fastest possible working cycles.